CPM Scheduling – projects

CPM Scheduling / Claims Consulting

Critical Path Method (CPM) Schedule with all required reports and presentations, fully cost and resource loaded. Provided monthly updates to the CPM, which included schedule narrative, crew/trade report, activities’ cost and resource updates

Projects:

The Westin Hotel, Sarasota, Florida

westin$76 million project schedule including demo of existing structure, relocation of electrical underground supply, site, underground, and detailed hotel floors activities. Provide monthly updates for the scheduled 30 months duration.
(currently under construction)

The VUE Condominium, Sarasota, Florida

VUE-condominium$60 million project schedule including site, underground, and 18 story condominium floors with all development details. Provide monthly schedule updates for the estimated 28 months schedule.
(currently under construction)

US 301 - Parish, Florida

A 5 phase, $22.8 million, 3.93 mile road and utility work project. Fully detailed to show complete road construction.

Bay Pine VA Hospital - Eye Treatment Center, Bay Pine, Florida

$8.9 million, New 5 Story hospital building with site work and all required hospital operation services

New Riviera Nursing and Rehabilitation Center, Miami, Florida

$22.3 million New 5 story center with multiple phases of construction, commercial kitchen, nursing operation and all necessary nursing utilities 3 underground parking levels w/ mechanical car lifts

Countryside Mall, Clearwater, Florida

Complete demo,and rebuild of site work, utilities, and a new major retail building addition

North Central Hillsborough Intertie - Contract 1

Tampa Bay Water, Florida: A multi-phase, $18.5 million, 34,000 linear feet of 84-inch diameter water transmission main.

Tampa Bypass Canal and Pump Station

Tampa Bay Water, Florida: A multi-phase, $12 million, intakes and pump station facilities.

North Central Hillsborough Intertie - Contract 2

Tampa Bay Water, Florida: A multi-phase, $20.6 million, 34,850 linear feet of 84-inch diameter water transmission main. It included the installation of 72-inch diameter butterfly valves, trenchless crossings, aerial crossings, corrosion control monitoring systems, and drainage modification.

South Central Hillsborough Intertie - Contract 1

Tampa Bay Water, Florida: A $18.4 million, 36,500 linear feet of 72-inch diameter water transmission main, multi-phase project.

U.S. Army Corps of Engineers - Savannah District

Provided a Government expert analysis and testimony on delay claim on a CPM Schedule developed by a construction contractor.
The project is located in Fort Bragg, North Carolina.

Florida DOT - Drew Street

All required reports and presentations on a multi-phase, $11.2 million, State road project.

Goodlette-Frank Road Widening

Collier County Florida: A 4 phase, $9.8 million, 2.93 mile road project. Fully detailed to show complete road construction.